PROJECTS

MOST RECENT PROJECTS

EXPERIENCE AND CAPACITY
CryoSys product line also include solutions for CO2, H2S, mercury removal, dehydration, heavies hydrocarbon recoveries integrated with the liquefaction, LNG truck loading and mine truck fueling systems.
MAINTENANCE
Our plant consist of only one single major piece of rotating equipment with a 99.5% availability and higher maintenance intervals of 5 years.
FLEXIBILITY
Optimized Mixed Refrigerant can be adjusted to ambient temperature changes and inlet gas conditions easily while the plant is in operation.
Previous
Next

25,000 GPD OMRTM  LNG Micro Plant

Location: Fort Nelson, Canada
Year Built: 2020

Engineering, Procurement, and fabrication of a complete liquefaction plant including the main systems:

  • Inlet Filtration
  • Mole Sieve Dehydration Unit
  • OMRTM Liquefier
  • MCC & Control Room
  • Utilities